Soffit and fascia starting with the soffit nail lengths of j channel against the inner edge of the fascia board.
Do i install siding or porch first.
Continue to set panels in the first row always including the expansion gap.
To prevent the relatively thin panels from buckling observe these fitting and nailing rules.
Gap at all ends.
It is just more beneficial to start with the windows.
But if the result is not a whole number you will need to cut the final piece of siding lengthwise in order to fill in.
Soffit and fascia if the soffit on your home wraps around a corner as with a hip roof you ll need to make some.
Install the first panel into the channels at one end of the porch.
Sfgate has a web page for how to install them yourself but it is very informational on the installation of windows before siding and why you should go in that order.
Nevertheless you can install the siding first if you have already started on that.
Tips when installing siding yourself.
Once you ve got a top trim board in place you can then slice and measure the corner boards.
Longer siding panels don t stretch as readily as smaller ones so they re not as easy to adjust if they get out of whack.
If you have to cut the last row of siding you ll.
Be sure to leave room for expansion.
Do not nail tightly.
Vinyl siding installation is designed to hang loosely on the sheathing so that it can expand and contract with temperature changes.
Most experts recommend installing the soffit first.
Divide the length of each wall by 8 inches the width of a piece of siding.
When cutting the last panel of the first course be sure to allow room for expansion.
The siding slides behind vinyl siding trim pieces that hide the gap and the cut end.
Install longer panels first when installing vinyl siding on each side of a window or door start on the side that needs the longer panels.
Nail the siding panel in place every 12 inches along the board with the same procedure as before.
If the result is a whole number you re in.
Nail every 8 to 12 203mm to 305mm positioning nails in the centers of slots.
Install the remaining panels.
You will want to calculate distance determine how many siding rows will be needed and then slice the top of the trim board to ensure everything is even.
Regardless of whether you are replacing a few cedar shingles removing rotten hardboard siding or installing entirely new fiber cement siding you will want it done right.